Planning Poker is a collaborative estimation technique used in Agile project management. It helps teams estimate the effort or complexity of tasks in a fun and engaging way. This method promotes active participation, ensuring that every team member's perspective is considered while reducing bias in the estimation process. Planning Poker is particularly useful for tasks with uncertainties, as it encourages open discussions and helps uncover potential challenges early in the planning stage. The process involves the team reviewing a user story or task from the product backlog.

Each team member uses a deck of cards with numbers representing effort or complexity levels, typically following a Fibonacci sequence. Without revealing their choices, team members select a card that reflects their estimation. Once all cards are shown, discussions take place to understand the rationale behind varying estimates, leading to a consensus on the final estimate. This interactive approach ensures clarity and alignment among team members.

Planning Poker not only fosters collaboration but also enhances decision-making and accuracy in task estimation. It reduces the risk of over or underestimating efforts, enabling teams to plan their sprints more effectively. By combining expertise, opinions, and data, Planning Poker empowers Agile teams to work smarter and deliver high-quality results consistently. This method has become a cornerstone of effective Agile planning.

What is Planning Poker?

Planning Poker is an Agile estimation technique designed to help teams evaluate the effort or complexity required for completing tasks. It involves a structured process that promotes team collaboration and minimizes bias. During a Planning Poker session, team members assess user stories or tasks from the product backlog and assign estimates using cards with numbers, often based on a Fibonacci sequence.

This method ensures that everyone in the team contributes their insights, fostering a well-rounded discussion about the task requirements. The strength of Planning Poker lies in its ability to combine diverse perspectives and encourage meaningful conversations. By discussing differing estimates, team members uncover assumptions, clarify uncertainties, and identify potential challenges in the work ahead.

This collaborative approach not only enhances the accuracy of estimates but also strengthens team alignment and planning efficiency. As a result, Planning Poker has become a vital tool for Agile teams to ensure realistic sprint planning and successful project execution.

How to “Play” Planning Poker

How to “Play” Planning Poker

Planning Poker is a collaborative estimation method widely used by Agile teams to determine the effort or complexity of tasks. It blends structured estimation with team discussions, ensuring a balanced and inclusive approach. This technique encourages every team member to participate and share their perspectives actively, resulting in accurate and realistic estimates.

The process is designed to minimize groupthink and bias while promoting transparency, alignment, and mutual understanding of project goals. In Planning Poker, team members individually estimate tasks using a set of numbered cards, typically based on the Fibonacci sequence (e.g., 1, 2, 3, 5, 8, 13). These numbers represent relative effort or complexity.

After individual estimates are revealed, the team engages in discussions to address differences and refine the estimates. The method fosters meaningful collaboration, identifies risks early, and ensures the team is prepared for effective sprint planning. Below is a detailed step-by-step guide to playing Planning Poker.

  • Prepare the Team and Materials: Begin by assembling the team members involved in the project. Provide each person with a deck of Planning Poker cards, which typically display effort values based on the Fibonacci sequence. Ensure everyone understands the process, its purpose, and the importance of participation. Clearly explain the rules of the game and emphasize that the goal is to arrive at a shared understanding of the tasks.
  • Review the User Story: Introduce the user story or task that needs estimation. The product owner or facilitator should describe the requirements, objectives, and expected outcomes in detail. Answer any questions team members might have to ensure a clear understanding. This step is critical to minimize confusion and align the team’s perspective on the scope of the work.
  • Choose Initial Estimates: Once the user story is explained, team members individually evaluate its complexity or effort. Each participant selects a card from their deck that reflects their estimation. Cards are kept private to avoid influencing others’ decisions and to ensure unbiased initial estimates.
  • Reveal the Cards: After all members have chosen their cards, everyone reveals their selections simultaneously. This prevents dominant personalities from swaying the group and allows for a diverse range of inputs. The estimates are then displayed for everyone to see, highlighting any differences or similarities.
  • Discuss Differences: Significant variations in estimates are analyzed through group discussion. Members who provided high or low estimates explained their reasoning, highlighting factors such as risks, uncertainties, or assumptions. These discussions help the team uncover overlooked details and align their understanding of the task.
  • Re-estimate as Needed: Based on the discussions, team members may revise their estimates to reflect the newly clarified understanding of the task. The team repeats the estimation process until they reach a consensus on a single estimate. This step ensures that everyone agrees on the effort required for the task.
  • Document the Final Estimate: Once a consensus is reached, the final estimate is documented for the task. This estimate will be used for sprint planning and prioritization. Keeping a record of the estimate helps track progress and serves as a reference for similar tasks in the future.
  • Reflect on the Process: At the end of the Planning Poker session, take time to reflect on the overall process. Discuss what went well and identify areas for improvement. This reflection helps the team refine their estimation practices for future sessions, leading to more efficient and effective planning.

Why is Planning Poker Used in Agile?

Why is Planning Poker Used in Agile?

Planning Poker is a vital estimation technique in Agile because it fosters collaboration, improves accuracy, and ensures alignment within the team. Unlike traditional estimation methods, Planning Poker encourages all team members to actively participate, ensuring that diverse perspectives are considered. It eliminates the influence of dominant opinions by using private estimates, followed by open discussions to address variations.

This approach not only promotes transparency but also highlights potential risks and assumptions early in the planning process. By combining individual insights with group consensus, Planning Poker helps Agile teams create realistic estimates for tasks or user stories. It encourages meaningful conversations, clarifies uncertainties, and builds a shared understanding of the work ahead.

This technique is especially useful for complex or ambiguous tasks where precise estimation is challenging. Ultimately, Planning Poker supports Agile values by promoting teamwork, adaptability, and continuous improvement, making it an essential tool for efficient sprint planning and successful project execution.

  • Promotes Collaboration: Planning Poker ensures that every team member has a voice in the estimation process. This inclusive approach encourages collaboration, where each person contributes their expertise and insights. The discussions that follow help align the team’s understanding and strengthen their commitment to the plan, fostering a sense of ownership and teamwork.
  • Improves Estimation Accuracy: Combining individual estimates with group discussions enhances the accuracy of task estimations. Discrepancies between estimates often reveal overlooked details or potential risks, allowing the team to refine their understanding and produce more realistic results. This leads to better sprint planning and reduces the likelihood of under or over-commitment.
  • Encourages Open Communication: The discussions in Planning Poker sessions create an environment of open communication. Team members can freely share their opinions, assumptions, and concerns about the task. This transparency helps address ambiguities, clarify expectations, and ensure that everyone is on the same page.
  • Reduces Cognitive Bias: By requiring private initial estimates, Planning Poker reduces the influence of cognitive biases such as anchoring or groupthink. This ensures that the estimates are unbiased and reflect each individual’s independent judgment, leading to a more balanced and fair estimation process.
  • Highlights Potential Risks: Discrepancies in estimates often point to potential risks or unknown factors in the task. Planning Poker encourages teams to explore these differences, identify risks, and consider mitigation strategies. This proactive approach reduces uncertainties and increases the chances of successful task completion.
  • Builds Team Alignment: Through discussions and consensus-building, Planning Poker ensures that the entire team shares a common understanding of the task. This alignment reduces misunderstandings and ensures that all team members are working toward the same goals, improving overall team cohesion and productivity.
  • Saves Time and Effort: Compared to traditional estimation methods, Planning Poker is an efficient way to estimate tasks. It combines independent evaluations and group discussions into a streamlined process, reducing lengthy debates while ensuring accurate and actionable estimates.
  • Supports Agile Principles: Planning Poker aligns with core Agile values such as collaboration, adaptability, and continuous improvement. It helps teams respond to change effectively, encourages regular reflection, and promotes an iterative approach to planning, making it a key tool in Agile project management.

The Benefits of Planning Poker

Planning Poker is more than just a task estimation tool—it’s a method that enhances collaboration, accuracy, and productivity within Agile teams. By combining individual assessments with group discussions, it ensures that every team member’s perspective is valued. This technique minimizes the risk of biased estimations and promotes open communication.

It is especially effective in fostering teamwork, as the process encourages meaningful discussions, clarifies uncertainties, and aligns team members on task requirements. Another advantage of Planning Poker is its ability to make the estimation process more engaging and efficient. Traditional methods often lead to lengthy debates, but Planning Poker streamlines this by integrating individual insights with quick, structured collaboration.

It also helps uncover hidden complexities, reduces risks, and sets realistic expectations for project deliverables. Ultimately, Planning Poker is a powerful tool for Agile teams, ensuring better planning, smoother execution, and improved project outcomes.

  • Encourages Equal Participation: Planning Poker ensures that every team member has an opportunity to contribute their perspective. This inclusivity prevents dominant personalities from overshadowing quieter members and promotes a balanced discussion. By valuing each team member's input, the process fosters collaboration and builds trust within the team.
  • Enhances Decision-Making: The process of discussing varying estimates uncovers critical insights about tasks. Team members evaluate risks, clarify ambiguities, and consider different approaches before reaching a consensus. This collaborative analysis results in better-informed decisions and higher confidence in the project plan.
  • Improves Estimation Accuracy: Combining independent estimates with group discussions enhances accuracy by addressing overlooked details or assumptions. The iterative approach ensures the team refines their understanding of the task, reducing the likelihood of underestimating or overestimating efforts, leading to more realistic planning.
  • Builds Shared Understanding: Through meaningful discussions, Planning Poker ensures the team aligns on task requirements and complexity. This shared understanding reduces misunderstandings during execution and helps team members collaborate effectively to achieve project goals.
  • Promotes Transparency: Planning Poker fosters an environment where team members openly share their thoughts, assumptions, and concerns. This transparency helps identify potential risks or challenges early, enabling the team to address them proactively. It also creates a culture of trust and accountability.
  • Increases Engagement: The gamified nature of Planning Poker makes the estimation process engaging and enjoyable for the team. This increased participation ensures more accurate estimates and strengthens team morale, fostering a positive and productive work environment.
  • Identifies Potential Risks: Differences in estimates often point to risks or complexities that may not have been initially apparent. By encouraging discussions around these discrepancies, Planning Poker helps the team identify and plan for challenges, reducing uncertainties and increasing the chances of success.
  • Streamlines Estimation Process: Planning Poker integrates independent evaluation and group discussion into a single, efficient process. This reduces the time spent on lengthy debates while ensuring accurate and actionable estimates. The structured approach also keeps the team focused and aligned throughout the estimation session.

Does Planning Poker Have a Downside?

While Planning Poker is a widely used and effective estimation technique, it is not without its challenges. One potential downside is that the process can be time-consuming, especially for teams dealing with a large backlog of tasks. Reaching a consensus on estimates often requires lengthy discussions, which can delay planning sessions.

Additionally, if the team lacks a clear understanding of the task or user story, the estimates may still be inaccurate despite the collaborative effort. Another issue arises when team members are hesitant to voice differing opinions. Factors such as lack of confidence, dominance by senior members, or time pressure can lead to groupthink, where individuals conform to the majority opinion.

This undermines the purpose of Planning Poker, as diverse perspectives are crucial for accurate estimations. Moreover, for tasks with little historical data or high uncertainty, even well-executed Planning Poker sessions might not yield reliable estimates, making it less effective for certain projects.

How Does Planning Poker Work?

How Does Planning Poker Work?

Planning Poker is a widely used collaborative estimation technique in Agile teams that allows for efficient and accurate task estimation. This process involves team members selecting a card that represents their estimation of the effort or complexity of a task, followed by a group discussion to reach a consensus.

Each card in the set typically contains Fibonacci numbers or similar sequences. This helps streamline the estimation process and makes it easier for teams to align on the expected workload for user stories or tasks. The process is designed to encourage participation from every team member, ensuring that all perspectives are heard.

By fostering discussions around different estimates, Planning Poker brings out the hidden challenges or uncertainties that might otherwise go unnoticed. The goal is to ensure that the team has a shared understanding of each task's scope and can plan sprints more effectively. Below is a practical breakdown of the steps involved in a Planning Poker session:

Step 1: Preparation and Setup

Before beginning the Planning Poker session, the team ensures that the tasks or user stories that need estimation are well-defined. The Scrum Master or Product Owner typically introduces the user stories, clarifies requirements, and answers any preliminary questions from the team. This step is crucial because it sets the stage for the rest of the process, ensuring that the team has enough context to make informed estimates.

Next, the team members are given Planning Poker cards, which often include numbers from the Fibonacci sequence (e.g., 1, 2, 3, 5, 8, 13, 21). These cards represent the effort or complexity that the team believes a particular task will require. It’s important that all cards are available and ready to be used to avoid delays during the session. The setup also includes ensuring that each team member has a clear understanding of the task at hand.

Step 2: Task Discussion and Clarification

Once the task or user story is introduced, the team engages in a discussion to ensure that everyone understands its requirements. The Product Owner typically explains the goals of the task, potential acceptance criteria, and any relevant background information. During this phase, team members may ask questions or request clarification about specific aspects of the task. This step is critical because it helps uncover any uncertainties, potential risks, or challenges that could impact the estimation process.

The discussion also allows the team to break down complex tasks into smaller, more manageable components. This is especially important for large or unclear user stories. By addressing ambiguities upfront, the team reduces the risk of incorrect estimates and ensures that everyone is aligned on what is required for the task. This open communication helps set a solid foundation for accurate planning, ensuring that team members are on the same page regarding the work involved.

Step 3: Independent Estimation

After the discussion, each team member independently selects a card that represents their estimate of the task’s complexity or effort. This step is done privately to avoid influencing each other’s estimates. The cards typically follow a number sequence, such as the Fibonacci series or T-shirt sizes (S, M, L, XL). The number chosen reflects how much effort or time the team member thinks will be required to complete the task.

The independent selection is crucial for ensuring that estimates are based on individual judgment rather than group pressure. Each team member draws from their experience, knowledge, and understanding of the task to come up with an estimate. This step helps the team capture a range of perspectives and prevents bias from influencing the estimation process. The variety in estimates often leads to valuable discussions, which ultimately refine the final estimate.

Step 4: Reveal Estimates

Once everyone has selected their card, the team reveals their estimates simultaneously. This prevents individuals from being influenced by others’ choices and ensures that the estimates remain independent. The reveal step often generates a range of estimates, with some being higher or lower than others. The different perspectives are then discussed, with the goal of understanding why estimates differ and what assumptions may have been made.

Revealing estimates at the same time helps highlight any significant differences in opinions early on. For example suppose if, one member estimates the task to be 1 point while another estimates it at 21 points. In that case,s, it signals that there are likely misunderstandings or assumptions that need to be clarified. This open reveal promotes transparency and allows the team to address any disparities in estimates before moving forward with the process.

Step 5: Discussion of Discrepancies

If the estimates vary widely, the team engages in a discussion to understand the reasons behind the discrepancies. This is where the members who gave the highest and lowest estimates typically explain their reasoning. This discussion can uncover hidden assumptions, missed requirements, or misunderstandings about the task. It often leads to a deeper understanding of the task's complexity and helps the team align on what the task entails.

The goal during this phase is to identify the underlying factors contributing to the differences in estimates. For example, one member may have considered technical challenges while another might not have realized the level of testing required. Discussing these differing views helps the team reach a more informed and accurate estimate. This step also helps ensure that the final estimate reflects the collective knowledge of the team rather than a narrow view.

Step 6: Re-estimation

After the discussion, the team re-estimates the task. Team members are encouraged to adjust their estimates based on the insights gained during the discussion. This phase typically results in a tighter range of estimates, as team members refine their views in light of the explanations provided. Re-estimation allows the team to collectively come to a more accurate understanding of the task’s complexity and helps eliminate outliers that may have been based on faulty assumptions.

Re-estimation can sometimes lead to a second round of discussions if the estimates still vary widely. However, the goal is to refine the estimates until a consensus is reached. This iterative process ensures that everyone’s opinion is taken into account and that the final estimate reflects a collective agreement. The more the team practices re-estimation, the better they become at aligning their estimates and increasing the accuracy of their planning.

Step 7: Final Estimate Agreement

Once the team reaches a consensus on the estimates, the final value is recorded. This estimate becomes the input for sprint planning, helping the team set realistic goals for the upcoming sprint. It is crucial that the final estimate reflects the collective agreement, even if there are still minor differences in individual opinions. This final agreement provides a clear direction for the team, allowing them to allocate resources and manage workload expectations for the sprint.

This phase also involves a final check to ensure that the agreed-upon estimate is reasonable and achievable within the scope of the sprint. If there are any doubts or the estimate is unclear, the team may choose to refine it further. However, once the estimate is agreed upon, the task is placed into the sprint backlog, and the team proceeds with planning the next steps.

Step 8: Reflection and Continuous Improvement

After the Planning Poker session, the team takes a moment to reflect on the process. They may discuss what went well, identify challenges they faced, and consider ways to improve their estimation process for future sprints. This step is essential for continuous improvement, as it helps the team learn from each session and refine their practices over time. Reflection helps enhance the accuracy and efficiency of future Planning Poker sessions.

By reflecting on the process, the team can make adjustments to ensure they are estimating tasks as effectively as possible. Over time, this reflection helps teams become more proficient at planning, ultimately leading to better sprint outcomes. Regularly incorporating these lessons into the process helps build trust, align expectations, and increase the overall effectiveness of the team.

Where Did Planning Poker Originate?

Planning Poker originated in 2002, introduced by James Grenning as a collaborative estimation technique for Agile software development. Mike Cohn later popularized the concept in his book Agile Estimating and Planning (2005). The Wideband Delphi technique, a group-based estimation method, inspired it. By integrating elements of gamification and structured discussions, Planning Poker offered a more engaging and efficient way for Agile teams to estimate task complexity and effort.

The method was developed to address the challenges of traditional estimation techniques, which often suffered from biases, inefficiencies, and a lack of collaboration. Planning Poker’s structured process ensures equal participation, encourages meaningful discussions, and improves the accuracy of estimates.

Since its introduction, it has gained widespread adoption across industries, becoming a cornerstone of Agile practices. According to a 2023 report by Digital.ai, 58% of Agile teams worldwide incorporate Planning Poker into their project planning sessions, demonstrating its lasting relevance and effectiveness.

What is the Planning Poker Estimation Technique?

What is the Planning Poker Estimation Technique?

The Planning Poker Estimation Technique is a collaborative method used in Agile environments to estimate the effort or complexity required to complete tasks or user stories. It is a card-based estimation technique that helps team members provide independent estimates, eliminating bias and encouraging open communication. The process involves team members selecting a card to represent their estimation of the task's effort, followed by a group discussion to reconcile any differences in estimation.

It promotes consensus-based decision-making and is highly effective in encouraging active participation from all team members. The technique uses cards that typically feature numbers from the Fibonacci sequence (e.g., 1, 2, 3, 5, 8, 13, 21), which represent varying levels of complexity or effort. This approach is useful in preventing over-optimistic or overly pessimistic estimates.

Once all estimates are shared, discrepancies are discussed, leading to a more refined and accurate estimate. The process repeats until a consensus is reached. Below are other popular estimation techniques that serve as alternatives or complements to Planning Poker.

1. Wideband Delphi Technique

The Wideband Delphi Technique is a more structured version of expert judgment estimation. It involves a group of experts who anonymously provide estimates for a task or project. These experts' estimates are then collected and reviewed. After that, they engage in a round of discussion where they explain their reasoning and consider the differences in their estimates. Based on the discussion, another round of estimates is made until a consensus is reached.

The process allows for detailed exploration of assumptions behind the estimates, helping to achieve a high degree of accuracy. Since the estimates are gathered anonymously at first, the technique helps reduce groupthink and biases. Each round of estimation and discussion refines the team’s understanding of the task, leading to increasingly accurate estimates. This method is particularly useful in complex or high-uncertainty projects.

2. T-shirt Sizing

T-shirt sizing is a simple and intuitive estimation technique where tasks are assigned to sizes that resemble T-shirt sizes: Small (S), Medium (M), Large (L), Extra Large (XL), etc. This technique allows teams to quickly categorize tasks without getting into numerical estimations. The size represents the relative effort required to complete the task compared to other tasks.

This approach works well for early-stage project planning when detailed estimations may not be necessary. It provides a clear, quick way to communicate the relative size of tasks, especially in larger teams or projects with many tasks. However, the downside is that T-shirt sizing lacks precision compared to techniques like Planning Poker, and teams might need further discussion for more complex tasks.

3. Affinity Estimating

Affinity Estimating is a technique where tasks are grouped based on their perceived complexity or effort without using numeric values. The team collectively discusses tasks and organizes them into relative categories, such as "high effort," "medium effort," and "low effort." Once the tasks are grouped, the team can assign more specific estimates to each group.

This technique is typically used when there is limited time, and a more detailed estimation process, like Planning Poker, is impractical. It is especially useful when tasks are relatively familiar to the team, and they have a shared understanding of their complexity. However, it can lack the precision of more detailed methods and might not be suitable for very complex or unfamiliar tasks.

4. Bucket System

The Bucket System is a hybrid estimation technique where tasks are grouped into “buckets” based on their size or complexity. Teams place tasks into these buckets, which are pre-assigned to various effort ranges (e.g., 1-5, 6-10, etc.). The task is then moved to the appropriate bucket based on the team's perception of its complexity.

This method works efficiently when estimating large numbers of tasks and helps teams quickly categorize tasks into rough effort ranges. The main advantage is its speed, as it doesn’t require individual estimates for each task. However, it lacks the detailed analysis found in techniques like Planning Poker, so it may not be as accurate for more nuanced tasks.

5. Three-Point Estimation (PERT)

Three-Point Estimation is based on the concept of uncertainty in estimating task effort. It involves estimating three different values: the optimistic estimate (O), the pessimistic estimate (P), and the most likely estimate (M). These three values are then used to calculate a weighted average, often using the formula: (O + 4M + P) / 6.

This method provides a more balanced and realistic estimate by considering a range of possible outcomes. It’s particularly useful when there is uncertainty about how long tasks will take, such as in projects involving new or unfamiliar technology. However, it requires team members to make more thoughtful and detailed estimates for each task, which can be time-consuming.

6. The Ideal Day Technique

The Ideal Day Technique involves estimating how many "ideal days" it would take to complete a task if there were no distractions, interruptions, or additional overhead. Team members estimate the time it would take to complete the task in a perfect scenario, which helps avoid underestimating the time required for actual work.

This method is helpful for tasks that are well-understood and relatively simple. However, the challenge lies in accurately assessing what constitutes an "ideal day," as it can be difficult to predict how much time a task will take in reality, especially in complex environments. This technique also assumes that the ideal day is consistent for all team members, which might not always be the case.

7. Monte Carlo Simulation

Monte Carlo Simulation is a statistical technique used to model the probability of different outcomes in a process that cannot easily be predicted due to the intervention of random variables. For project management, Monte Carlo methods are applied to task estimates to predict the likelihood of completing a project on time and within budget, based on historical data.

This technique is useful for complex projects where uncertainty is high, and there is a need for risk assessment. Monte Carlo Simulation helps teams estimate a range of potential outcomes by running simulations with different inputs. However, it requires a significant amount of data and can be difficult to implement without specialized software or statistical expertise.

8. Planning Poker with Modification

While the traditional Planning Poker is highly effective, some teams opt to modify it for specific needs. For example, in certain contexts, teams may use a modified card deck where cards represent specific time intervals or task categories (e.g., hours, days, or a specific tool requirement). This modification can make the session more relevant to a specific project.

This modified approach allows the team to tailor the Planning Poker technique to suit the needs of their project. However, it requires a thorough understanding of the modifications to ensure everyone on the team is aligned. The flexibility of this method makes it suitable for projects with unique requirements, but it can also introduce complexity into the estimation process.

Which Organizations Should Use Planning Poker?

Which Organizations Should Use Planning Poker?

Planning Poker is an Agile estimation technique that helps teams collaboratively estimate the effort required to complete a task, user story, or feature. It encourages communication among team members, promoting transparency and ensuring that everyone’s input is considered when making important project decisions.

Through a series of discussions and votes, Planning Poker helps teams align on the complexity of tasks and ensures a shared understanding, making it an essential tool for organizations that value collaboration and accurate planning. Different organizations, especially those using Agile or Scrum methodologies, can greatly benefit from the Planning Poker technique.

This includes companies in software development, product management, marketing, IT infrastructure, healthcare, and even educational institutions. Whether it’s for estimating software development tasks, managing marketing campaigns, or coordinating IT system upgrades, Planning Poker helps teams improve the accuracy of their time and resource planning. Below are the types of organizations that can leverage Planning Poker to enhance their estimation processes.

1. Agile Software Development Companies

Agile software development companies are the prime candidates for using Planning Poker. Since these teams work in iterative cycles (sprints) to develop software, task estimation plays a crucial role in ensuring that work is completed within the sprint’s time frame. Planning Poker aligns with Agile principles of collaboration, flexibility, and continuous improvement. It encourages team participation from developers, testers, and product owners, making the estimation process collaborative and transparent.

In Agile software development, accurate estimations are essential for maintaining a steady pace. By using Planning Poker, teams can discuss the scope of a task, uncover hidden complexities, and align on a shared understanding. Each team member’s individual input is valued, reducing the chance of overlooking challenges and ultimately leading to more reliable sprint planning. Additionally, because Agile software development emphasizes continuous learning, teams can improve their estimation accuracy over time as they refine their understanding of effort and complexity in subsequent Planning Poker sessions.

2. Product Management Teams

Product management teams, who often deal with the planning and delivery of features or products, also benefit from Planning Poker. This technique helps product managers accurately gauge the effort required to develop product features or user stories, ensuring they can set realistic expectations with stakeholders. Planning Poker brings all relevant voices into the estimation process, ensuring that not only product managers but also developers, designers, and testers weigh in with their perspectives. This results in more informed decision-making and better alignment between teams.

In product management, time and resource management is crucial. Estimating the scope of work accurately ensures that teams do not overcommit or underperform. With Planning Poker, product managers can align product vision with realistic timelines, reduce risks associated with project scope, and prioritize features effectively. The discussion that follows the estimation process helps uncover potential risks, dependencies, and issues that might impact the timeline or deliverables, making it an essential tool for managing product development cycles.

3. Consulting Firms

Consulting firms, which often work on projects with varied scope, clients, and timelines, can benefit greatly from Planning Poker. The nature of consulting involves solving complex problems for clients, and accurate estimation of effort is crucial to managing client expectations and meeting project deadlines. By using Planning Poker, consulting teams can collectively estimate the effort required for different phases of a project, from research and analysis to solution implementation.

For consulting teams, Planning Poker helps ensure that tasks are scoped realistically, considering both client requirements and internal resources. When a team is working on a consulting project, task complexity can vary greatly depending on the client's business domain, so estimating effort accurately is essential. The group discussion that follows each estimate allows the team to consider all possible challenges, such as technical constraints or resource limitations, and adjust their plan accordingly. This leads to more precise proposals, better client communication, and an improved ability to meet deadlines.

4. IT and Software Infrastructure Teams

IT and software infrastructure teams are tasked with maintaining and upgrading systems, networks, or software applications, which often require considerable technical expertise and coordination. Planning Poker can be an invaluable tool for estimating tasks such as system deployments, infrastructure upgrades, and software migrations. Given the complex and interdependent nature of these tasks, Planning Poker enables teams to break down large, technical projects into smaller, manageable units while ensuring that all perspectives are considered.

For IT and software infrastructure teams, Planning Poker helps identify the technical complexity of each task. This collaborative process ensures that engineers, architects, and other stakeholders are aligned on the expected effort and challenges of each task. It also fosters an open dialogue about potential issues, such as integration difficulties, compatibility problems, or security risks. As a result, these teams can improve their ability to plan, allocate resources effectively, and reduce the likelihood of delays caused by unforeseen technical challenges during the execution phase.

5. Marketing and Creative Agencies

Marketing and creative agencies, which are often responsible for running campaigns, designing content, and launching products, can benefit from Planning Poker when estimating the effort required for their tasks. Whether it’s creating an advertising campaign, designing a website, or developing brand materials, Planning Poker ensures that all team members contribute to the estimation process, leading to more realistic project timelines and budgets.

For marketing and creative agencies, the value of Planning Poker lies in its ability to bring diverse viewpoints together. Designers, content creators, copywriters, and project managers can all participate in the estimation process, ensuring that all aspects of a project’s complexity are considered. Additionally, by discussing estimates and reaching consensus, teams can better understand the overall scope of work, potential bottlenecks, and resource requirements. This collaborative approach enhances alignment within the team and improves the agency’s ability to deliver high-quality projects on time and within budget.

6. Healthcare and Research Organizations

Healthcare and research organizations often engage in complex projects, such as clinical trials, medical device development, or research initiatives, which require careful planning and accurate time estimation. Planning Poker helps healthcare and research teams estimate the effort needed for various tasks, such as study designs, data collection, and regulatory compliance. This ensures that team members are aligned on the scope and expected challenges, ultimately leading to better project outcomes.

In the context of healthcare and research, Planning Poker fosters collaboration among multidisciplinary teams, including researchers, clinical experts, and data scientists. The open discussions that follow each estimate help identify potential risks and technical challenges that could impact the project timeline or outcomes. By utilizing Planning Poker, these organizations can set more realistic expectations with stakeholders, allocate resources effectively, and reduce the likelihood of delays due to unforeseen complexities. This leads to more efficient project management and better results for clients or patients.

7. Educational Institutions and Training Organizations

Educational institutions and training organizations can also benefit from Planning Poker when estimating the effort involved in developing courses, designing workshops, or creating learning materials. In these organizations, task estimation helps instructional designers and educators align on the time and resources required to develop and deliver effective educational content. Planning Poker ensures that all team members have an opportunity to contribute their insights into the complexity of course development, helping to set realistic timelines for curriculum creation or training programs.

In educational settings, Planning Poker helps improve transparency and communication across teams. Instructional designers, subject matter experts, content creators, and project managers can discuss and estimate the work involved in creating educational materials. This collaborative approach ensures that everyone is aware of potential challenges, such as the need for research, testing, or stakeholder approval. By using Planning Poker, educational teams can improve the efficiency of their content development process, delivering high-quality learning experiences on time and within the allotted budget.

When Do Teams Use Planning Poker?

Teams use Planning Poker during the planning and estimation phase of Agile project management to evaluate the effort or complexity of tasks. It is particularly effective when dealing with tasks or user stories that involve uncertainty or require input from multiple perspectives. By combining individual estimates with group discussions, Planning Poker ensures a balanced and accurate estimation process.

This technique also helps teams identify risks, clarify ambiguities, and align on task expectations, making it essential for effective sprint planning. Planning Poker is commonly used in scenarios where collaboration and consensus are critical. It is not only beneficial for estimating new or complex tasks but also for revisiting previous estimates when project requirements change.

Teams also rely on Planning Poker for improving transparency and accountability in the planning process. Below are some specific situations where this method is highly effective.

  • For Building Team Alignment: Teams use Planning Poker to ensure every member understands the task requirements and objectives. The discussions that follow help resolve ambiguities, align expectations, and create a cohesive understanding of the workload, fostering unity and collaboration.
  • During Cross-Functional Meetings: In teams with diverse skill sets, Planning Poker helps bridge gaps in understanding. Each member shares their perspective, creating a shared vision and ensuring that the complexities of tasks are addressed from multiple angles.
  • For Addressing Conflicting Opinions: When team members have differing views on task complexity, Planning Poker provides a structured framework to discuss and resolve conflicts. This open dialogue strengthens trust and improves decision-making within the team.
  • To Identify Skill Gaps: Through task discussions, Planning Poker highlights areas where the team may lack specific expertise. This insight enables managers to allocate resources, plan training, or bring in additional support to ensure task completion.
  • For Promoting Accountability: Planning Poker fosters ownership by involving every team member in the estimation process. This ensures that everyone understands their responsibilities and feels accountable for their part in achieving project goals.
  • In Remote Teams: For distributed or remote teams, Planning Poker helps maintain collaboration and ensures that all voices are heard, even when members are not physically present. Tools like online Planning Poker platforms make this process seamless.
  • To Improve Team Communication: Regular use of Planning Poker strengthens communication within teams. It encourages members to express their thoughts clearly and listen to others’ insights, creating a culture of open dialogue and mutual respect.
  • For Iterative Planning: Agile teams often use Planning Poker in iterative planning cycles. This allows them to adapt to changing requirements, revisit previous estimates, and ensure continuous alignment, keeping the project on track.

What is Scrum Poker?

Scrum Poker, also known as Planning Poker, is an Agile estimation technique used to evaluate the effort and complexity of user stories or tasks in Scrum. The process involves the team members independently assigning a value to a task by selecting cards, typically numbered in the Fibonacci sequence (1, 2, 3, 5, 8, 13, etc.), representing the perceived effort. Once all members have selected their cards, the team discusses the reasons behind their estimates and strives to reach a consensus.

This collaborative approach ensures that all perspectives are considered before making a final decision. Scrum Poker enhances the accuracy of estimates by promoting a shared understanding of tasks. It encourages active participation from all team members, ensuring that even the quieter voices are heard. This technique is particularly useful for complex or ambiguous tasks where individual assumptions can lead to different conclusions.

By discussing estimates openly, Scrum Poker uncovers uncertainties or hidden risks, allowing the team to make more informed decisions. It also fosters a sense of ownership and accountability within the team, contributing to better sprint planning and more efficient project execution.

Who to Include in Scrum Poker Meetings?

Who to Include in Scrum Poker Meetings?

Scrum Poker (or Planning Poker) is an estimation technique used in Agile project management, especially in Scrum teams, to collaboratively estimate the effort or complexity of tasks or user stories. In Scrum, the goal is to foster collaboration, transparency, and consensus in planning and estimating work for upcoming sprints. The meeting encourages all relevant team members to contribute their knowledge, perspective, and expertise to create more accurate estimates.

The diverse set of opinions that emerges during a Scrum Poker meeting helps prevent any task from being overlooked, ensures more realistic estimations, and aligns the team on project priorities and objectives. To ensure the success of Scrum Poker meetings, it is crucial to include the right people who are involved in the execution of the work and can provide informed insights.

Including a diverse group ensures that the estimates reflect the knowledge and perspectives of all team members. Below are the key participants who should be involved in Scrum Poker meetings to ensure that the process is effective and accurate.

1. Product Owner

The Product Owner is a key participant in Scrum Poker meetings because they are responsible for defining and prioritizing the backlog. As the person who has the final say on the product features, user stories, and requirements, the Product Owner helps provide context during the meeting. They clarify any questions that arise regarding the scope, priorities, or acceptance criteria of a task, ensuring that the team has a clear understanding of the task at hand. Their presence ensures that the team has accurate information regarding what needs to be accomplished, which is vital for forming accurate estimates.

In addition to providing context and answering questions, the Product Owner also helps facilitate alignment across the team on product goals and priorities. Since the Product Owner is responsible for managing the product backlog, their participation is critical to help ensure that the team is estimating the right tasks and features for the upcoming sprint. Without the Product Owner, the Scrum Poker meeting could lack the necessary guidance on what should be prioritized and how to break down features into actionable user stories for estimation.

2. Scrum Master

The Scrum Master plays a facilitative role in Scrum Poker meetings, ensuring that the process runs smoothly and that team members stay on track. They are responsible for guiding the team through the Scrum process, removing any obstacles that may impede progress, and ensuring that the team adheres to Agile principles. During the meeting, the Scrum Master ensures that everyone has an opportunity to contribute and that no one dominates the discussion. They create a safe environment where all team members feel comfortable offering their input and estimates.

Additionally, the Scrum Master helps manage any disagreements or conflicts that arise during the meeting. When there are significant differences in estimates, the Scrum Master ensures that the team engages in a constructive discussion to clarify assumptions and reach a consensus. Their facilitation skills are critical in maintaining a focus on productive discussion and consensus-building, preventing the meeting from devolving into debates or misunderstandings. Their presence guarantees that the process is inclusive, collaborative, and effective.

3. Development Team Members (Developers, Engineers, Designers)

The development team is made up of individuals who will be directly responsible for executing the tasks or user stories being estimated. Therefore, including developers, engineers, and designers is essential in Scrum Poker meetings to provide valuable insights into the complexity and effort of each task. These team members bring their expertise in their respective areas, such as coding, testing, and design, which enables them to assess the technical feasibility and effort involved in implementing a task.

Including developers and designers allows the team to better understand potential challenges that may not be immediately obvious from a high-level perspective. For example, a developer may recognize that a task will involve complex coding or that there is a risk of integration issues with other components. Designers may highlight the need for user interface adjustments or specific design requirements that could affect the effort required. By having these team members participate in Scrum Poker, the team can avoid overestimating or underestimating the amount of work involved, leading to more accurate sprint planning.

4. QA/Testers

Quality Assurance (QA) testers are essential participants in Scrum Poker meetings, as they bring an understanding of the testing effort required to verify and validate each task. They are responsible for ensuring that the deliverables meet the acceptance criteria, function correctly, and maintain quality standards. Including QA testers helps ensure that the estimation process accounts for the effort involved in testing, bug fixes, and quality checks that may be required for each user story or task.

QA testers often have a different perspective from developers and product owners, focusing on the quality, stability, and usability aspects of the tasks being estimated. For example, a tester might foresee challenges in developing comprehensive test cases or foresee potential risks in the integration phase. By including them in Scrum Poker meetings, the team can make sure that the testing effort is fully accounted for, which prevents underestimating the time required for QA and testing. Their input ensures that testing is an integrated part of the overall estimation process and helps deliver high-quality products.

5. Business Analysts (If Applicable)

Business analysts (BAs) are valuable participants when included in Scrum Poker meetings, especially if the team is working on complex user stories or business requirements. BAs are responsible for gathering and analyzing business requirements and translating them into functional specifications. Their role in the meeting is to help clarify the business needs, user expectations, and high-level project objectives, providing insight into the context of each task or user story.

The inclusion of business analysts helps ensure that the team has a clear understanding of the business goals and user requirements. They can offer clarifications and help define acceptance criteria, reducing any ambiguity in the task. Moreover, BAs bring a comprehensive view of the business landscape, ensuring that estimates consider not only the technical aspects of the work but also the strategic impact on the business. Their presence helps ensure that the team is aligned with the broader business objectives and that the product is developed with the end-user in mind.

6. Stakeholders (Optional but Beneficial)

In some cases, stakeholders, such as clients or upper management, may be included in Scrum Poker meetings. While this is not a common practice, having stakeholders present can be beneficial, particularly in situations where there is a need for immediate clarification or alignment on priorities. Stakeholders can provide valuable insights into the business needs, constraints, and strategic direction, which can help shape the estimations and planning process.

However, the inclusion of stakeholders should be carefully managed. While their input is valuable, their participation could also risk complicating the process if they do not fully understand the technical aspects of the work. The Scrum Master and Product Owner should ensure that the stakeholders’ contributions are constructive and that they do not disrupt the flow of the meeting. Having stakeholders in the room ensures that everyone is aligned on the project’s priorities and goals, helping to avoid misunderstandings down the line.

7. External Subject Matter Experts (SMEs)

In some situations, external subject matter experts (SMEs) may be invited to Scrum Poker meetings to provide specific expertise on complex or specialized tasks. For example, an external security expert may be included if a user story involves security-related requirements or a legal advisor may join if there are regulatory compliance issues to consider. SMEs bring specialized knowledge that can clarify specific aspects of a task that other team members may not have the expertise to address.

The role of SMEs in Scrum Poker is to provide clarity and technical insight into specialized areas, helping the team understand the full scope of the task. Their input can prevent misestimations due to a lack of knowledge in a particular domain, ensuring that all aspects of the work are considered. Although they may not be involved in day-to-day project work, SMEs offer valuable contributions when specific tasks require deep technical or domain expertise.

8. Project Manager (If Applicable)

In some Scrum teams, particularly in organizations where Scrum is not fully adopted, a Project Manager (PM) may be involved in the Scrum Poker meetings. The PM’s role is to oversee the overall project delivery, track progress, and manage risks. While the Scrum Master is responsible for ensuring the Scrum process is followed, the Project Manager can bring a broader perspective on how tasks fit into the overall project timeline and resource allocation.

The involvement of a Project Manager can help the team understand the dependencies between tasks, external constraints, or broader project timelines. This ensures that the estimates made in the Scrum Poker session align with the larger project goals. However, the PM should avoid influencing the estimation process too much, as the focus should remain on the team’s collective judgment. The Project Manager’s role is to provide context on how estimates impact overall delivery timelines without overshadowing the collaborative nature of Scrum Poker.

When to Have a Planning Poker Session

Planning Poker sessions is essential during key stages of an Agile project to ensure accurate task estimation and alignment within the team. These sessions are typically conducted at the beginning of a sprint, during backlog refinement, or when new tasks or user stories are introduced. Scheduling Planning Poker sessions allows teams to collaboratively estimate the effort and complexity of tasks, which helps them plan more effectively.

The collaborative discussions during these sessions also promote a shared understanding of the work ahead. Timing is crucial, as Planning Poker is most effective when the team has sufficient information about the tasks and when their collective input is needed to clarify uncertainties and identify potential risks.

Planning Poker is best used when estimating tasks of moderate to high complexity or when there is a need to revisit earlier estimates based on new insights. Here are some key moments when it’s ideal to conduct a Planning Poker session:

  • At the start of a Sprint: Teams use Planning Poker at the beginning of each sprint to estimate the user stories and tasks that will be worked on. This helps determine realistic goals for the sprint, balancing the workload and aligning expectations across the team.
  • During Backlog Refinement: Planning Poker is helpful during backlog refinement sessions when the team is reviewing and grooming user stories. It helps prioritize tasks by estimating the effort required, allowing for better sprint planning and a more manageable workload.
  • When New Features are Introduced: Whenever new features or user stories are introduced to the project, Planning Poker ensures that the team understands their complexity and scope. Estimating these tasks early on enables teams to better plan their sprint and allocate resources effectively.
  • For Revising Previous Estimates: When project requirements change or new information emerges, Planning Poker can be used to revisit and revise previous estimates. This helps ensure the team stays aligned and is aware of any updated priorities or changes in scope.
  • When Facing Complex Tasks: For tasks that are particularly complex or ambiguous, a Planning Poker session allows the team to break them down into smaller, more manageable components. The collaborative discussions provide clarity and ensure that everyone is on the same page.
  • During Cross-Functional Planning: When different team members from various departments (e.g., developers, designers, product owners) need to collaborate on estimating a task, Planning Poker ensures that everyone’s perspective is considered. This helps ensure comprehensive estimates that reflect all aspects of the task.
  • When Introducing New Team Members: Planning Poker is useful when onboarding new team members as it encourages them to engage with the existing team members and understand the project’s tasks and goals. It helps new members familiarize themselves with the team’s estimation process and expectations.
  • To Align on Task Understanding: When there is confusion or disagreement regarding a task’s requirements or complexity, a Planning Poker session can be used to clarify expectations. The process encourages team members to discuss and align on the task’s scope, ensuring a shared understanding and commitment to the project.

Conclusion

Planning Poker is a powerful tool in Agile project management that enhances team collaboration and improves the accuracy of task estimations. By encouraging input from all team members, including developers, testers, and the Product Owner, it ensures that every aspect of the task is considered, resulting in well-rounded and realistic estimates.

This technique fosters transparency, reduces bias, and promotes a shared understanding of the work required. Through regular practice, teams can improve their estimation skills, leading to more effective sprint planning and better project outcomes. Ultimately, Planning Poker contributes to smoother workflows and higher productivity within Agile teams.

FAQ's

👇 Instructions

Copy and paste below code to page Head section

Planning Poker is an Agile estimation technique where team members estimate the effort or complexity of tasks by choosing cards with different values. These estimates are then discussed, and a consensus is reached to determine the final effort required for the task.

Planning Poker is important because it helps teams collaboratively estimate tasks, ensuring accurate and balanced input from all members. It reduces the risk of misestimation and promotes transparency, allowing teams to make better decisions during sprint planning and improving the efficiency of the project.

Each team member selects a card representing their estimate of task complexity after discussing the task requirements. Cards are revealed simultaneously to avoid influence, followed by a discussion to address discrepancies. The process is repeated until a consensus is reached, and the final estimate is recorded for sprint planning.

Key participants in a Planning Poker session include the development team, Scrum Master, and Product Owner. The development team provides estimates based on their expertise, while the Product Owner clarifies requirements. The Scrum Master facilitates the session to ensure that it runs smoothly and ensures that everyone is heard.

Planning Poker cards typically use a Fibonacci-like sequence (1, 2, 3, 5, 8, 13, 21, etc.) to represent varying levels of complexity or effort. Some teams may also use T-shirt sizes (S, M, L, XL) to estimate task effort. The cards help visualize the varying levels of difficulty perceived by the team members.

While Planning Poker is primarily designed for Agile environments, it can be adapted to other project management frameworks. It can still facilitate collaborative task estimation and improve team communication, ensuring a better understanding of project scope and effort.

Ready to Master the Skills that Drive Your Career?
Avail your free 1:1 mentorship session.
Thank you! A career counselor will be in touch with you shortly.
Oops! Something went wrong while submitting the form.
Join Our Community and Get Benefits of
💥  Course offers
😎  Newsletters
⚡  Updates and future events
undefined
Ready to Master the Skills that Drive Your Career?
Avail your free 1:1 mentorship session.
Thank you! A career counselor will be in touch with
you shortly.
Oops! Something went wrong while submitting the form.
Get a 1:1 Mentorship call with our Career Advisor
Book free session
a purple circle with a white arrow pointing to the left
Request Callback
undefined
a phone icon with the letter c on it
We recieved your Response
Will we mail you in few days for more details
undefined
Oops! Something went wrong while submitting the form.
undefined
a green and white icon of a phone